TRAVERSE CITY — Finishing touches are becoming more visible to Civic Center visitors across the park’s spectrum of amenities, with a few final projects set to reopen to the public by early November.
The Grand Traverse County-owned park and recreation hub encompasses 45 acres and has received significant upgrades through a series of grants, county funds and fundraising efforts through Norte Youth Cycling, a local nonprofit that has established its clubhouse within the park.
In 2025, the county was awarded a $992,084 Revitalization and Placemaking (RAP) grant through the Michigan Economic Development Corporation (MEDC) to replace the park’s South Building, which includes public restrooms. The grant also went toward the installation of a pump track — recently opened to the public — and new signage around the Civic Center perimeter.
“It’s been a great year for improvements at the Civic Center,” county Administrator Nate Alger said Tuesday, adding that the South Building’s construction is days away from completion.
According to county Facilities Director John Chase, previous upgrades to the Civic Center’s 1-mile walking track, parking lot paving, fitness stations around the track and additional connecting pathways were covered through a Michigan Department of Natural Resources Spark grant awarded to the county in 2022. The popular footbridge was also replaced last year after being struck by a garbage truck. Following its removal in April 2025, the elevated bridge was replaced and reopened in August later that year.
The pump track — a closed-loop, paved biking circuit featuring rolling hills and berms — was funded in part by the RAP grant and fundraising efforts through Norte. According to Chase, the county’s Parks and Recreation Commission planned for a pump track in the Civic Center’s site plan in 2020.
“Every day, there’s people out there; it’s a fantastic addition to the park,” Chase said.
New signage is also part of the park’s renovations, with two identification signs placed at the north and south ends of the Civic Center. The north-end sign will feature an electronic message display and is scheduled to be installed Friday, Chase said. The display will be used to identify the county’s park along Front Street, as well as display upcoming event information.
“We’re going to be very careful with how we’re using that,” Chase said. “It’s not intended to be something that’s distracting (to drivers), no blinking or flashing, none of that stuff.”
The replacement of the South Building will provide new public restrooms, which are set to open within the next two weeks. The building also includes storage for maintenance and field equipment, as well as a shop for county facilities staff.
“Our last piece is one that, quite frankly to me, is the most exciting because who doesn’t enjoy a good bathroom in a park?” Chase said.
The building is largely complete, the director said, adding that some finishing touches are still holding up the reopening. The building is still waiting for locking mechanisms, as well as final safety installations.
Funding from the county’s general fund — a total of $388,000 — was allocated to match Norte’s contributions, as well as brownfield funding totaling approximately $375,000.
“There were multiple, large partners and individual donors that came together to make all this happen,” Chase said.
Norte Executive Director Jill Sill is also continuing to work with the county on a long-term lease of the park’s current facilities building to create a bicycle education center, which Chase anticipated to come before county commissioners next year.
One lasting piece of the RAP grant received its final touches Wednesday as artist Nik Burkhart finished the mural commissioned for the side of the new South Building, featuring a retro carnival-inspired map of the Civic Center’s historical significance.
“We hatched the idea working with Nik, to have the mural depict the past, present and future of the park,” Chase said. “We wanted to show the history of the park.”
The building, including Burkhart’s mural, is expected to have a ribbon-cutting ceremony for its opening in November. The Civic Center is located at 1213 W. Civic Center Drive in Traverse City.